Change the status of a project and close it.
Put a project on hold, mark it complete, and find it again afterwards.
- 5 steps
- 3 min read
Part of the path for Project managers
Before you start
Sign in with access to Projects. The project must already exist. This example uses the project North Ridge office retrofit for North Ridge Builders. All names and details are fictional.
What is a project status?
The status tells everyone where the project stands. PLANNING means it is being prepared and is not sold yet. ACTIVE means work is under way. ON HOLD means work has stopped for now. COMPLETE means the work is finished.
FINALIZED is the last step after COMPLETE. It is for the office, once the last invoice and costs are in, and it locks the project. CANCELLED is for a project that will not go ahead.
Closing a project is simply setting it to COMPLETE when the site work and the deficiency list are done. The project and all its records stay in PolarPath.
Open the project
Click Projects in the menu on the left. Then click the project in the list.
Click the status button
The coloured button under the project name shows the current status, here ACTIVE. Click it.
Choose the new status
A list opens. Click ON HOLD to pause the project, or COMPLETE when the work is finished. FINALIZED is for the office after the last invoice.
Check the status
The button now shows COMPLETE. The status changes right away, with no extra question.
Find the project later
Go back to Projects in the menu. The project has left the Active tab. Click Completed to see it.
The result.
The project is marked COMPLETE and sits under Completed on the Projects page. Its records can still be opened.
If you get stuck
Picked the wrong status? Click the button again and choose the right one. Before you complete a project, check the Overview tab: Needs attention should show no open issues, deficiencies or RFIs. You can also change the status of several projects at once from the Projects page with Set status.
What to do next
Find your way around the Projects page
See every project in one list, filter it, and open the one you need.
6 simple steps →Deficiency listAdd an item to the deficiency list
Record something that still has to be fixed before the job is handed over.
6 simple steps →Billing and profitCheck the costs and profit of a project
Open the profitability report to compare what was quoted with what the job has cost.
6 simple steps →