Export the schedule and present it.
Save the Gantt chart as a file and show it full screen in a meeting.
- 6 steps
- 3 min read
Part of the path for Project managers
Before you start
Sign in with access to Projects. The project must already have a schedule. This example uses the project North Ridge office retrofit for North Ridge Builders, with a sample schedule of three phases, eleven activities and two milestones. All names and dates are fictional.
Why export or present?
A Gantt chart is a calendar for a project. Each piece of work, called an activity, is drawn as a bar. The left end of the bar is the day the work starts and the right end is the day it ends, so you can see at a glance what happens when and what overlaps.
Export saves the schedule as a file on your computer: a PDF snapshot, an image, or a spreadsheet of the activity list. You can then attach it to an email yourself. Nothing is sent by PolarPath.
Presentation mode hides the editing buttons and fills the screen, which is handy when you walk a customer through the plan.
Open the project
Click Projects in the menu on the left. Then click the project in the list.
Click Open schedule
On the project page, click Open schedule at the top. The Schedule page opens with the Gantt chart.
Click Export
On the Schedule page, click Export.
Choose the file type
Choose Timeline snapshot PDF for a printable page, Timeline PNG or Timeline SVG for an image, or Task grid CSV for a spreadsheet. The file downloads to your computer.
Turn on Presentation
Click the Presentation switch beside Export.
Present the plan
The chart fills the screen without the editing buttons. A Presentation label shows beside the title. Turn the switch off, or press Escape, to go back.
The result.
You have a file of the schedule to share, and a clean full-screen view for meetings.
If you get stuck
The PDF shows the period that is on screen, so zoom and scroll to the right dates before you export. In presentation mode you cannot edit activities.