Track progress on the Gantt chart.
Record how much of an activity is done and colour bars so the team sees status at a glance.
- 6 steps
- 3 min read
Part of the path for Project managers
Before you start
Sign in with access to Projects. The project must already have a schedule. This example uses the project North Ridge office retrofit for North Ridge Builders, with a sample schedule of three phases, eleven activities and two milestones. All names and dates are fictional.
What is progress tracking?
A Gantt chart is a calendar for a project. Each piece of work, called an activity, is drawn as a bar. The left end of the bar is the day the work starts and the right end is the day it ends, so you can see at a glance what happens when and what overlaps.
Each activity has a completion percent. 0% means not started and 100% means finished. When an activity is finished its bar turns green and striped with a check mark, and its name is crossed out in the list.
You can also give a bar its own colour, for example orange for work that needs attention.
Open the project
Click Projects in the menu on the left. Then click the project in the list.
Click Open schedule
On the project page, click Open schedule at the top. The Schedule page opens with the Gantt chart.
Open the activity
Click the activity name in the list, here Remove old rooftop unit. Its details open.
Set the completion
Under Completion, click a quick value such as 75%, or type the exact number. Click Completed at the top when the work is finished.
Choose a bar colour
Under Bar color, click a colour, here orange. Use default goes back to the normal blue.
Save and check the chart
Click Save activity. The bar shows the new colour. You can also tick the round box in front of a name in the list to mark it complete in one click.
The result.
The chart shows how far each activity has come and which ones are finished.
If you get stuck
Completed work cannot be undone by colour: untick the round box or set the completion back below 100% to reopen an activity. Phases show the progress of the activities inside them.
What to do next
Read the Gantt chart
Understand the bars, phases, milestones and arrows, and zoom the calendar in and out.
6 simple steps →Gantt chartsChange the dates of an activity
Move an activity or make it longer or shorter when the plan changes.
5 simple steps →Gantt chartsComment on an activity
Leave a note on one activity of the schedule for the rest of the team.
5 simple steps →