Write a project report for the day.
Record what happened on site today: the work done, the weather and safety.
- 5 steps
- 3 min read
Part of the path for Project managers
Before you start
Sign in with access to Projects. The project must already exist and be active. This example uses the project North Ridge office retrofit for North Ridge Builders. All names and details are fictional.
What is a project report?
A project report is the diary of the job for one day. It says what work was done, what the weather was, who was on site, what arrived and anything that slowed the work down. Many companies call it a daily report or a daily field report.
You write one report for each day worked. Over time the reports become the history of the project. If there is ever a question about a delay or about who was on site, the answer is in the report for that day.
A project report is different from a timesheet. The timesheet records hours for pay and job cost. The project report tells the story of the day in words. A report starts as a draft, and you can share it with the customer once it is approved.
Open the project
Click Projects in the menu on the left. Then click the project in the list.
Open Project Reports and start a new one
On the project page, click the Project Reports tab. Then click New report.
Check the date and the weather
The form opens on today. Change Report date if you are writing about another day. PolarPath looks up the weather for the site by itself. You can also choose it in Weather and enter the high and low temperature.
Describe the work and safety
In Work summary, write what was done today in one or two sentences. In Safety notes, write what safety measures were in place and whether anything happened. The other parts of the form, such as crew, equipment, deliveries and delays, are optional.
Create the report
Click Create report at the bottom. The report shows in the list with its number, DFR-0001, the date and the status DRAFT. The Drafts tile shows 1.
The result.
Today's report is saved on the project as a draft. You can open it again to add the crew, photos and deliveries, then approve it. Nothing is sent to the customer until you choose to share it.
If you get stuck
If Create report does nothing, check Report date: it is the only field you must fill. If the weather stays empty, choose it yourself in Weather. Use Add crew entry, Add equipment, Add delivery and Add delay only when they apply. The share icon at the end of a report line emails the report: use it only when the report is final.
What to do next
Start a project and find your way around it
Open Projects, start a new project from a won quote and learn the tabs of the project page.
5 simple steps →Gantt chartsAdd activities, milestones and links
Build the schedule: add an activity, choose its type and tie it to the work that must finish first.
6 simple steps →RFIsCreate an RFI on a project
Write down a question for the customer or the designer and track the answer.
6 simple steps →