What is a submittal?

A submittal is a package of documents that you send to the designer or the customer for approval before you order equipment or start building. Typical submittals are shop drawings, product data sheets and samples.

The approval protects you. If the engineer approved the rooftop unit data sheet, nobody can say later that you installed the wrong unit.

PolarPath tracks each submittal with a number, its type, who has to review it and its status, so you can see which approvals are still open. A submittal is different from an RFI: an RFI asks a question, a submittal asks for approval of something you plan to use.

01/05

Open the project

Click Projects in the menu on the left. Then click the project in the list.

02/05

Open Submittals and click New submittal

On the project page, click the Submittals tab. Then click New submittal.

03/05

Name it and choose the type

In Title, write what the package is, for example: Rooftop unit shop drawings. In Submittal type, choose the kind, here Shop Drawings. In Spec section, enter the section of the specification it belongs to, if you know it.

04/05

Describe the scope

Lower on the page, in Scope / description, write what is being submitted and who should review it. Priority is Normal unless the approval is urgent.

05/05

Create it

Click Create submittal at the bottom. The submittal is saved as a draft with the number SUB-001 and shows in the Submittals list. Send for signature emails the package to the reviewers: do that only when the documents are attached and ready.

The result.

The submittal is saved on the project as a draft. The Not yet submitted tile shows 1. Nothing has been sent.

If you get stuck

If Create submittal does nothing, fill in Title. Add the drawings on the Attachments tab of the submittal and the reviewers on the Workflow tab before you send it. Plan submittals on the Submittals tab can build a list of expected submittals from the project quote.

What to do next