Log an issue on a project.
Write down a problem on the job so someone owns it and it does not get lost.
- 5 steps
- 3 min read
Part of the path for Project managers
Before you start
Sign in with access to Projects. The project must already exist. This example uses the project North Ridge office retrofit for North Ridge Builders. All names and details are fictional.
What is an issue?
An issue is a problem or a risk on the job that your team needs to follow until it is solved. A locked roof hatch, a late delivery and a clash between two drawings are all issues.
Logging an issue gives it an owner, a priority and a status. It shows on the project overview until it is closed.
An issue is for your own team. If you need an answer from the customer or the designer, create an RFI. If the problem changes the price, record a change. You can turn an issue into an RFI or a change later.
Open the project
Click Projects in the menu on the left. Then click the project in the list.
Open Issues and click Log issue
On the project page, click the Issues tab. Then click Log issue.
Describe the problem
In Summary, write one short line. In Description, say where it is and what it blocks. Leave Priority as Normal, or raise it if work is stopped.
Flag the impact
Under Impacts, click Schedule impact if the issue can delay the job. A box for the number of delay days appears. Use Cost impact or Design change in the same way.
Log it
Click Log issue at the bottom. The issue shows in the list with the priority NORMAL and the status OPEN.
The result.
The issue is saved on the project with the status OPEN. The Open tile on the Issues tab shows 1 and the project overview counts it under Open issues.
If you get stuck
If Log issue at the bottom does nothing, fill in Summary: it is the only field you must fill. Use Assigned to and Due date to give the issue an owner and a deadline. Use Edit on the issue line to change its status when it is solved.
What to do next
Create an RFI on a project
Write down a question for the customer or the designer and track the answer.
6 simple steps →Change requestsRecord a change on a project
Write down extra or changed work, with its price and the days it adds.
5 simple steps →Deficiency listAdd an item to the deficiency list
Record something that still has to be fixed before the job is handed over.
6 simple steps →